Build Day #12

IMG_1986Today we said goodbye to skip number two.

IMG_1996The servant’s toilet door was blocked up.

IMG_1991A structural steel was placed into the brickwork to hold up the chimney above the future breakfast room.

IMG_1990More of the walls around the toilet were removed. Unfortunately this revealed that the floor level inside the toilet is higher than the other floor. Not sure what will happen with that but I assume it will be dug out. It means that more quarry tiles will have to be relaid than I thought.

IMG_1988The breakfast room is taking shape. Note the old wooden toilet roll holder still on that back wall.

IMG_1992See the blue bucket? The section of wall directly behind it (about three bricks wide) is still to be removed, which will open up the room to the light of the new rear doorway to the garden.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s