Build Day #81

IMG_3973Electricians installed lights and smoke detectors in the hallway.

IMG_3996Wall lights in the lounge. They don’t have their little shades on yet.

IMG_3987Toilet.

IMG_3986Another hallway light.

IMG_3988Back bedroom (former servant’s bedroom).

IMG_3989On the back landing this fitting was attached to the still wet filler – a bit of a mess really but the electricians were determined to power up whether we were ready of not. In the end they spent half the day trying to figure out a short they had created in the downstairs sockets. So in fact some of the rooms that were ready, sanded and painted still didn’t get their lights! Argh! Frustrating.

IMG_3991Downstairs cloak room now empty after the removal of the old toilet. The little pane of broken glass in the window has been removed and a replacement ordered.

IMG_3994Rosie inspecting. Thankfully the terrazzo under the toilet was undamaged.

IMG_3992Our new, single stopcock for incoming water. Much better than the four original ones!

IMG_3993I have the hooks to put back on these timber struts. I just need to apply some paint remover to the old hooks first though.

IMG_3972P the plumber connected the top floor to the main pipework and the temporary pipe was removed. Also, on the top landing the three old pipes that ran up this wall to the old expansion tank in the roof were removed. It won’t be long until the temporary Great Wall on the left is removed too so that this ceiling can be over-boarded and plastered.

IMG_3977All of the taps and pipes and toilets were commissioned. In the darkness you can see Oliver sizing up his new steam bath platform. He likes to accompany you in the bathroom when you are having a shower and needs somewhere to sit.

IMG_3979Spotting the running water in the basin for the first time.

IMG_3981These waterfall taps are great.

IMG_3984Endless fun.

IMG_4005The trouble is now the cats come to expect water on demand…

IMG_4003New rim latch and handle on the under servant stairs cupboard. Looking smart.

IMG_4002And on the servant’s stairs door.

IMG_4014New handle and mortise latch on the kitchen door.

IMG_3974Ceiling rose ring ready for fitting in the master bedroom.

IMG_3999Range cooker fitted and connected to gas and electricity. Shiny.

IMG_4039Oliver inspecting the ovens.

IMG_4015There are going to have to be some new rules enforced when the kitchen comes into use.

2014-08-15 15.22.14JB and P the plumber lighting the gas for the first time. We have fire!

 

IMG_4045Miss Rose. Just because.

IMG_3997Washing machine taps and outlet in the utility closet.

IMG_4047Build Day #81 was yesterday (Friday) and today there was a small amount of work done but I don’t consider today’s work a fully separate and complete build day as the trades were only here for an hour or so. The roofers were replacing roof tiles until their tile cutter broke down. T the kitchen man measured up for the glass splashback in the kitchen. The tilers came and fitted the splashbacks in the toilet…

IMG_4048…and bathroom.

IMG_4049They also repaired some of the lost grout in the kitchen and breakfast room quarry tile floors ready for Monday’s final cleaning and sealing.

IMG_4050As of Monday everyone will be barred from these two rooms while the floor is treated. Everything has been completed in here apart from the final electrical testing and the fitting of the over counter kitchen lights, both of which are low impact on the floor. Then on September 1st it will be time for us to move into these rooms!

IMG_3880

They will become the new ‘Cat Headquarters’ and we will be moving all of their things in – cat beds, cat trees, food, litter, toy box etc. The rooms will also be my new Command Central for the rest of the build.

 

 

 

 

 

 

Advertisements

2 thoughts on “Build Day #81

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s