Stage 2, Day 32

On Day 32 T the decorator continued work. I didn’t take pictures as it was mainly more undercoats on the woodwork.

IMG_2634The outside wall got its first coat of render, called the scratch coat.

IMG_2641And P the plumber began the second fix. Radiator in the utility.

IMG_2636Toilet starting to go in.

IMG_2639The little basin.

 

IMG_2637High-level cistern.

IMG_2640And radiator. I was concerned that this room might be too cramped but it all fits in neatly, making the most of the available space.

 

Advertisements

2 thoughts on “Stage 2, Day 32

  1. the exterior wall of the WC looks just as charming and stylish as the interior. Every aspect is a triumph of vision, planning and execution. bravo.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s